Welcome: Shenzhen Gewei Technology Co,.Ltd

Data Center Solutions

Construction and operation of data center will break the distributed construction mode. High centralized management of dynamic use of physical resources and virtual resources is needed to improve the system flexibility, reduce the cost, improve the service and risk management. But with the centralized development trend of the data centre, how to construct a large and medium-sized data centre with high reliability, easy manageability and good expandability is the biggest challenge for data centre contractuction and operation.

 

数据中心.png



Gewei's pre-terminated cabling system is composed of MTP/MPO connectors,compact designed OM3/OM4 multimode optical cables, plug-and-play modules, which greatly decrease cable consumption between the servers, storage devices and make the system simplified. It is used to achieve the function of green data centre and makes equipment maintenance easy, Besides the pre-terminated cabling system,  Sopto also can provide the 10G40G100G QSFP28 fiber modules, AOC and DAC cables, Network cabinets, network cards for the data center, which provide the one stop shop for the data centre customer.



PREVIOUS:Exhibitions Arrangement in 2019 No next

CATEGORIES

CONTACT US

Contact: Mr.Tony

Phone: +86-13418458707

E-mail: support@glovion.com/ tony@glovion.com

Add: No. 42 North Pinchuangyuan Industrial Park Industrial East Road, Longhua Street, Longhua District, Shenzhen